Planning / Compare options

Two paths. Different scopes.

Give your elevators a new look without replacing everything. Commercial elevator resurfacing uses architectural film to refresh suitable cab interiors, doors and landings. Compare elevator wraps with cosmetic interior replacement to find the right approach for your building.

COMPARE YOUR OPTIONS

See the Difference Before You Decide.

Watch how existing elevator surfaces can take on a new appearance without requiring full cosmetic replacement.

  • Cost Savings30%-80% less compared to the traditional elevator renovation methods.
  • Reduced DemolitionLess tear-out where existing surfaces are sound.
  • Less DisruptionLess intrusive, quiet, and much quicker than a full interior replacement.
  • Professional InstallationEstimated and installed by Resurface Wraps.

A new look, with less to replace

Elevator resurfacing, also called elevator wraps or film-based elevator refinishing, keeps suitable existing panels in place. The surfaces are prepared and wrapped with your chosen finish, reducing demolition, disposal and the need for new panels.

Choose from hundreds of architectural film finishes, including wood grains, brushed metals, stone, marble, solid colors and textures. Refresh elevator cab interiors, elevator doors and landings with finishes that complement your property. Cosmetic interior replacement instead removes existing decorative panels and finishes and replaces them with new materials.

Explore architectural film finishes

Compare cost, installation and disruption

Elevator resurfacing starts around $5,000 per cab and usually ranges from $5,000–$10,000 per cab, with landing openings around $1,500 each. Cosmetic interior replacement starts around $15,000 per cab. Resurfacing can offer potential savings of 30–80% compared with replacement, depending on comparable project scope. These are planning estimates, not guaranteed quotes.

Resurface Wraps often completes resurfacing in 1–2 working days per cab, depending on preparation, access and site conditions. Cosmetic replacement typically takes several days or longer because it involves removing existing materials and installing new ones.

Resurfacing may require a temporary elevator outage if installation cannot be performed while operating. Replacement typically requires a shutdown during removal and installation. Scheduling is coordinated with your property contacts, based on the work involved and your building’s needs.

Explore elevator resurfacing costs and savings

Choose the right approach for your building

If your elevator interiors look dated or worn but the existing panels are in good condition, resurfacing may deliver the change you want without a full cosmetic rebuild. Final pricing depends on cab count, surface area, preparation, finish selection, access and site conditions.

Replacement may be a better fit when panels are badly damaged, surfaces cannot accept film, or you want a design that requires new components. This comparison covers decorative surfaces, not mechanical elevator modernization.

Share your cab count, photos and the areas you want to refresh. Resurface Wraps can review your elevator cab interiors, doors and landings and help you compare the options for your property.

Plan your cosmetic elevator renovation · Get a project-specific quote

ConsiderationArchitectural Film ResurfacingCosmetic Interior Replacement
Cost factorsStarting around $5,000 per cab, with potential savings of 30–80% compared to replacement. Pricing depends on cab count, surface area, preparation, film selection, and site conditions.Starting around $15,000 per cab. Costs depend on new materials, demolition, disposal, installation, and project requirements.
Existing surfacesSuitable existing panels and surfaces are retained, prepared, and wrapped with architectural film.Existing decorative panels and finishes are typically removed and replaced with new materials.
DemolitionMinimal demolition when existing surfaces are suitable, reducing removal, disposal, and associated labor.Removal and disposal of existing panels and finishes are typically part of the project.
MaterialsHundreds of architectural film finishes, including wood grains, brushed metals, stone, marble, solid colors, and textures.New metal, laminate, wood, glass, or custom decorative panels, depending on specifications.
InstallationProfessional installation by Resurface Wraps, often completed in 1–2 working days per cab, depending on scope and site conditions.Installation typically takes several days or longer, depending on demolition, materials, and complexity.
DisruptionWork may require temporarily taking the elevator out of service if installation cannot be performed while operating. Scheduling depends on the scope and property requirements.Elevator shutdown is typically required during removal and installation, with duration depending on the replacement scope.

Pricing represents illustrative starting benchmarks for cosmetic elevator interiors, not guaranteed quotes. The 30–80% potential savings range should be supported by comparable project pricing. Actual costs, schedules, and downtime vary by project.

A useful next step

Your elevators may not need replacing.

Before investing in new elevator interiors or doors, let us review what you already have.

Get a Project Quote