Planning / Compare options

Two paths. Different scopes.

Resurfacing and replacement are not interchangeable. The right option depends on the condition of the existing surfaces, the building’s objectives and the full scope under consideration.

A practical comparison

Resurfacing applies a new finish over suitable existing decorative surfaces. Cosmetic replacement removes and replaces selected finishes. Neither option changes elevator mechanics unless separately specified and coordinated with the elevator service provider.

Know what the comparison includes

Ask each project team to identify substrate preparation, material, demolition, waste handling, access, staging, outage coordination and exclusions. Replacement may be necessary where current surfaces are unsuitable; resurfacing can be considered when existing surfaces pass review.

When replacement may be the better fit

Significant damage, unstable substrates, larger modernization needs or a design requirement that cannot be met with a finish layer may point toward replacement. A qualified review is essential.

ConsiderationSurface resurfacingCosmetic replacement
Cost factorsCab count, covered area, surface preparation, film selection and site access shape the estimate.Removal, replacement materials, disposal, access and installation scope shape the estimate.
Existing surfacesRetained if suitable, prepared and compatibleSelected decorative surfaces removed and replaced
DemolitionCan reduce demolition of existing finish layersRemoval and disposal may be part of scope
MaterialsArchitectural film applied as a finish layerReplacement materials depend on the specification
InstallationProfessional application coordinated by Resurface WrapsScope and installation methods vary by project
DisruptionTemporary elevator outage required; plan by projectOutage and disruption depend on replacement scope
A useful next step

Your elevators may not need replacing.

Before investing in new elevator interiors or doors, let us review what you already have.

Get a Project Quote